| | The following calculation is used to size the stone storage bed (reservoir) used as a base course. It is assumed that the footprint of the stone bed will be equal to the footprint of the pavement. The following equations are taken from the ICPI Manual <ref>Smith, D. 2006. Permeable Interlocking Concrete Pavements; Selection, Design, Construction, Maintenance. 3rd Edition. Interlocking Concrete Pavement Institute. Burlington, ON.</ref> | | The following calculation is used to size the stone storage bed (reservoir) used as a base course. It is assumed that the footprint of the stone bed will be equal to the footprint of the pavement. The following equations are taken from the ICPI Manual <ref>Smith, D. 2006. Permeable Interlocking Concrete Pavements; Selection, Design, Construction, Maintenance. 3rd Edition. Interlocking Concrete Pavement Institute. Burlington, ON.</ref> |
| | | | |
| − | ===To calculate the total depth of the stone reservoir (all graded layers)=== | + | ===To calculate the total depth of the foundations (all aggregate layers)=== |
| − | The equation for the depth of the stone bed is as follows: | + | The equation for the depth of the stone foundation (''d<sub>f, max</sub>'', mm) is as follows: |
| | | | |
| − | <math>d= \frac{[Q_c\times R + P - f'\times t ]}{V_{R}}</math> | + | <math>d_{f, max}=\frac{\left[\left ( RVC_{T}\times R \right )+ RVC_{T}-\left(f'\times t\right )\right]}{V_{R}}</math> |
| | {{Plainlist|1=Where: | | {{Plainlist|1=Where: |
| − | *''d'' = Stone bed depth (m) | + | *''RVC<sub>T</sub>'' = [[Runoff volume control target]] (mm) |
| − | *''Q<sub>c</sub>'' = Depth of runoff from contributing drainage area, not including permeable paving surface (m)
| + | *''R'' = ''A<sub>c</sub>''/''A<sub>p</sub>''; the ratio of contributing drainage area (''A<sub>c</sub>'') to permeable paving area (''A<sub>p</sub>''). Note that the contributing drainage area (''A<sub>c</sub>'') should not contain pervious areas. R should not normally exceed 2. |
| − | *''R'' = ''A<sub>c</sub>''/''A<sub>p</sub>''; the ratio of contributing drainage area (''A<sub>c</sub>'') to permeable paving area (''A<sub>p</sub>''). Note that the contributing drainage area (''A<sub>c</sub>'') should not contain pervious areas. | + | *''f''' = [[Design infiltration rate]] (mm/hr) |
| − | *''P'' = Rainfall depth (m)
| |
| − | *''f''' = Design infiltration rate (m/day) | |
| | *''t'' = Time to fill stone bed (typically 2 hr) | | *''t'' = Time to fill stone bed (typically 2 hr) |
| | *''V<sub>R</sub>'' = Void ratio for stone bed (typically 0.4 for 50 mm dia. [[reservoir aggregate|clear stone]])}} | | *''V<sub>R</sub>'' = Void ratio for stone bed (typically 0.4 for 50 mm dia. [[reservoir aggregate|clear stone]])}} |
| | + | |
| | + | On highly permeable soils (e.g., infiltration rate of 45 mm/hr or greater), a maximum stone reservoir depth of 2 metres is recommended to prevent soil compaction and loss of permeability from the mass of overlying stone and stored water. |
| | | | |
| | ===To calculate the invert of the underdrain from the base of the reservoir=== | | ===To calculate the invert of the underdrain from the base of the reservoir=== |
| − | For designs that include an underdrain, the maximum depth of the stone reservoir below the invert of the underdrain pipe (''d<sub>s, max</sub>'') can be calculated as follows: | + | |
| | + | For designs that include an underdrain, the maximum depth of the storage layer below the invert of the underdrain pipe (''d<sub>s, max</sub>'') can be calculated as follows: |
| | <math>d_{s, max}=\frac{f'\times t}{0.4}</math> | | <math>d_{s, max}=\frac{f'\times t}{0.4}</math> |
| | {{Plainlist|1=Where: | | {{Plainlist|1=Where: |
| | *''f''' = Design infiltration rate (mm/hr), and | | *''f''' = Design infiltration rate (mm/hr), and |
| | *''t'' = [[Drainage time]] (hrs), e.g. 96 hours, check local regulations for drainage time requirements. | | *''t'' = [[Drainage time]] (hrs), e.g. 96 hours, check local regulations for drainage time requirements. |
| − | *''0.4'' = Void ratio of [[reservoir gravel|clear stone]]}} | + | *''0.4'' = Void ratio of [[Reservoir aggregate|clear stone]]}} |
| | | | |
| − | ----
| |
| − | (f') used in the above equations should be the [[design infiltration rate]] that incorporates a safety correction factor. On highly permeable soils (e.g., infiltration rate of 45 mm/hr or greater), a maximum stone reservoir depth of 2 metres is recommended to prevent soil compaction and loss of permeability from the mass of overlying stone and stored water.
| |
| | ---- | | ---- |
| | When sizing the area of permeable paving based on the contributing drainage area, the following equation may be used: | | When sizing the area of permeable paving based on the contributing drainage area, the following equation may be used: |
| | <math>A_p= \frac{Q_c\times A_c}{V_R \times dp – P + q'\times t}</math> | | <math>A_p= \frac{Q_c\times A_c}{V_R \times dp – P + q'\times t}</math> |
| | | | |
| − | [[category:modelling]] | + | |
| | + | Back to [[Permeable pavements]] |
| | + | [[Category:Calculations]] |